
Singapore - Jurong
Singapore
ClientPUB
SolutionCambiTHP - B6
Jurong
The Jurong WRP, owned and operated by the Public Utilities Board (PUB), is located in west Singapore. The plant treats industrial and municipal wastewater.
PUB chose to install a Cambi thermal hydrolysis system to process waste activated sludge (WAS), which is pre-treated together with fats, oil, and grease, and then cooled through tube-in-tube coolers before being sent to the digesters and dewatered by centrifuge.
Cambi supplied a B6 unit as well as the digester coolers. The system can be expanded to allow for future capacity requirements.
Explore other customer stories

Cambi's second thermal hydrolysis plant in Singapore will treat secondary solids from 2026.

Cambi thermal hydrolysis plant in Brisbane, in operation since 2007. Turned over by Brisbane Water to Queensland Urban Utilities in 2010.

Cambi thermal hydrolysis plant to be commissioned for Wellington, New Zealand in 2026.

Cambi thermal hydrolysis plant in Anyang, South Korea in operation since 2016. Operated by Posco Engineering and Construction.

Write your own success story
Seen what we've done for others? Let’s chat about how we can do the same for you. Get in touch with our team to learn how thermal hydrolysis can transform your plant, too.