Maximising biogas in anaerobic digestion by using engine waste heat for thermal hydrolysis pre-treatment of sludge

Pickworth, B, Adams, J, Panter, K, and Solheim, OE

Water Science and Technology, 2006

Abstract

Dublin's Ringsend WWTP was designed to serve a population of approximately 1.2 million p.e. with a sludge production of 37,000 dry tonnes per year after upgrading to full secondary treatment. Several technical solutions were put forward as part of a design, build, finance and operate (DBFO) competition, with the chosen solution being a proposal by Black and Veatch for a combination of sequencing batch reactor (SBR) technology and anaerobic digestion with Cambi thermal hydrolysis pre-treatment (THP).

The THP plant was built by Cambi and handed over to B&V in 2002. The plant is now operated by Celtic Anglian Water. In September 2004, a test was carried out on the mass and energy balance of the plant following 2 years of operation and is detailed in this paper.

Download or read the full article in Water Science & Technology.

 

img

Write your own success story

Seen what we've done for others? Let’s chat about how we can do the same for you. Get in touch with our team to learn how thermal hydrolysis can transform your plant, too.

Talk to our team